The 1-acre line and the 2-acre line

Last checked: October 20, 2026 against the source documents. Based on: CGP sections 1.3.1.A, 3.1.1.G, 3.1.2, 3.1.6, 3.2.1, 3.2.7, 3.2.10, 4.2, 4.3, 5.2.C, 7.1 and Appendix A; SC Reg. 72-305 and 72-307.

Two numbers come up most for small builders. One acre decides whether permit coverage is needed. Two acres decides who must prepare the plan and who may do the inspections, but the permit words the 2-acre line differently in different sections, so we quote it exactly.

The 1-acre line: is coverage needed?

The 2-acre line: three different wordings

RuleExact wording in the permitWhat the permit says
Who prepares the C-SWPPP“For construction sites that disturb more than 2 acres” [CGP 3.1.2.B, p.25]The plan must be “prepared, amended when necessary, certified, and stamped” by a registered professional engineer, a registered landscape architect, a Tier B land surveyor, or certain federal government employees. [CGP 3.1.2.B, p.25]
For two acres or less that are not part of an LCP, SC Regulation 72-305 says the simplified plan “does not require approval by the implementing agency and does not require preparation or certification by the designers specified in R.72-305H and R.72-305I” [REG 72-305.B(1), p.14], and R.72-307H calls for a “sketched plan (engineer's, Tier B surveyor's or landscape architect's seal not required)”. [REG 72-307.H(5), p.23] SCDES's web page says that “In most cases” the SWPPP must be prepared by a licensed PE, Tier B land surveyor, or landscape architect. [CA]
Unconfirmed, verify with SCDES and your MS4: who may prepare plans for sites of 2 acres or less, including sites that are part of an LCP. The permit (3.1.5.A) still requires C-SWPPP approval before construction, while R.72-305.B(1) says the small-site plan doesn't need approval. Coastal sites have an extra rule in CGP 3.1.2.D.
Who may do the inspections“For Projects that disturb more than 2 acres” and “For Projects that disturb 2 acres or less, and that are not part of an LCP” [CGP 4.2.E, p.54]More than 2 acres: “qualified personnel”, meaning the C-SWPPP preparer; a person with equivalent registration who has the required knowledge and skills; a person under the direct supervision of someone qualified to prepare a C-SWPPP; or “An individual who has been certified through a Construction Site Inspector Certification Course that has been approved by SCDES”. [CGP 4.2.E, p.54] SCDES's web page says “At present Clemson University's CEPSCI course meets this requirement.” [CA]
2 acres or less, not part of an LCP: “the Permittee or his designee may perform these inspections provided the preparer of the C-SWPPP explains the OS-SWPPP including implementation along with the inspection requirements to the person who will be conducting the inspections”. [CGP 4.2.E.I, p.54] SCDES and regulated MS4s “reserve the right to require that inspections be performed by an inspector meeting the requirements of 4.2.E.I for construction sites less than two acres in size that drain to Sensitive Waters”. [CGP 4.2.E.II, p.54]
Unconfirmed, verify with SCDES: 4.2.E.II points back to 4.2.E.I (the permittee/designee rule), which may be a cross-reference error. It also doesn't say who may inspect sites of 2 acres or less that ARE part of an LCP.
Maps in the C-SWPPP“sites 2 acres and greater or sites that are part of an LCP that disturb 2 acres or more collectively” vs. “sites that are less than 2 acres and not part of an LCP” [CGP 3.2.7.A, p.41; 3.2.7.B, p.42]The larger sites need the full map set (topographic, soils, floodway, vicinity, and drainage maps). [CGP 3.2.7.A, p.41] Sites under 2 acres and not part of an LCP need a shorter list: a site location drawing, boundary lines, a topographic map if the implementing agency requires one, and the locations of the stormwater and sediment control measures. [CGP 3.2.7.B, p.42] The narrative for those smaller sites must also describe the sediment control plan, the topography and soils, and adjacent properties. [CGP 3.2.1.A.VII, p.30]
Notice of Termination“For Projects disturbing more than 2 acres” [CGP 5.2.C.VI, p.59]A certification signed by the C-SWPPP preparer (or a person with equivalent registration) that the work was done in accordance with the approved OS-SWPPP and the CGP. [CGP 5.2.C.VI, p.59]

Unconfirmed, verify with SCDES: how a site of exactly 2.0 acres is treated. The map rule applies at '2 acres and greater' (3.2.7.A), the preparer, inspector, and NOT rules apply at 'more than 2 acres' (3.1.2.B, 4.2.E, 5.2.C.VI), and SCDES's web page says '2 acres more'.

Larger sites have more rules. “For non-linear construction sites disturbing more than 5 acres, the Comprehensive SWPPP must be submitted with a phased erosion prevention and sediment control plan”. [CGP 3.1.1.G.II, p.23] “For construction sites subject to Regulation 72-400, that disturb 5 acres or more”, the C-SWPPP must be sealed by a registered professional engineer licensed in SC. [CGP 3.1.2.C, p.25]

Rules that apply at every size (summaries; read the quoted sections)

Becoming a CEPSCI inspector: Clemson's page says that, effective August 2026, Statewide Certification classes are Day One classroom instruction, then a simulated site inspection on the morning of Day Two and the certification exam (“Now Open - Book”) that afternoon. Remaining 2026 date listed: online, December 2-3, 2026. In-person classes are held at the River Center in Saluda Shoals Park, Columbia, and the Aug. 12-13, Sept. 9-10, and Oct. 14-15, 2026 sessions have passed. [CEP] Clemson's Fees and Policies page lists “Class, certification exam, materials: $395” and “Recertification class: $275”. [CEPF]

Sources for this page

Citations like “CGP 4.2.B, p.53” mean section 4.2.B of the permit, on page 53 of the PDF. Last checked October 20, 2026. Where we quote, the quote is copied from the source; where we summarize, read the quoted section before relying on it.